St James The Fisherman worship Centre Yeppoon

Stjames (1 of 7) St James WorshipStjames (6 of 7)StJames (10 of 27)StJames (6 of 27) Centre Yeppoon.

The building was built using concrete masonry with suspended concrete slab,structural steel roof with color bond roofing.

The building consists  of chapel ,sanctuary , multi purpose areas that can be opened up with use of operable wallsStJames (13 of 27) and an under croft that can be accessed by an internal elevator.

Features include,Polished  timber dais, clear finished ply floating ceiling, italian tiles and a marble water feature to the entry.

The worship centre has a state of the art audio visual system and an under floor  hearing loop.

The new facility was opened November 2015.

 

St James’s Anglican Church Yeppoon

IMAG2413 IMAG2468 IMAG2584 IMAG2574I am pleased to be able to say that the new St James Anglican Church in Yeppon  is well under way and on track,despite hitting rock and some inclement weather.

These shots were taken before the Christmas break and since then we have completed the Block work to the under croft and the form setter and steel fixer are on site look to be ready for a concrete pour on Thursday 23rd Jan. A big thanks to Ian from Ando’s excavation , Shane Marsden Blocklaying and his crew, and Patrick Kirwan Form setters and and his team for their big effort in getting us up out of the ground before  the wet weather set in . Also well dome to Graham Stark site foreman and Tony Carter  our leading hand in just about every thing form excavation to concreting and block laying.

And a special thank you to Charlie Finches Surveyors and his men for coming in at short notice on several occasions to get the set out done and keep the job moving .

Dawson Village New Mess Halll

IMAG2341 IMAG2345 IMAG2332The new Mess hall for Anglo America at Dawson Village Moura is progressing well and currently we are about 1 week  ahead of our construction program.

Site Foreman Peter Woolley hopes to complete the job ahead of our expected date for practical completion IMAG2339and has complemented all the subcontractors who have been working on the job for helping to keep the job on track.

Contractors to date include

Wieland Concreting,

JAF Electrical,

Think Water Plumbing,

Pierce Engineering

BPM Cowlrick Mechanical

C Harris- Framing & Plastering &

Ian Brill RoofingIMAG2347

Pybus Place Emu Park Capricorn Coast

This brand new brick veneer low set town house gated community is now ready to go to market with a combination of 8×2 bed & 3×3 bed town houses starting at $325,000. Situated just a few minutes from the beach , the bowls club and just a short stroll into town theses dwelling offer the beach life style at an affordable price .

Suitable for  a wide range of  buyers whether your are a retiree , investor or someone looking for a week-ender where you can relax and enjoy yourself by  the beach

All dwellings have been built with easy of access in mind and low maintenance.They all come  with en suites, Ac to main bed & living area , ceiling fans ,Smeg appliances, carpeted bedrooms with tiles to living and wet areas,and they all have security screens, auto garage doors and auto gate to  main driveway entry.

For a full list of inclusions please contact one of our agents Adam de Jong from Keppel Real estate 0413906108, Bradd Dillon Emu Pk Real estate  0408783374 or Russell Breach from Ray white Yeppoon 0417657966.

106Pattison-St-Image-Rev-Web 106Pattison-St-Bedroom-Print 106Pattison-St-Ensuite-Print 106Pattison-St-Kitchen-Print 106Pattison-St-Living&Dinning-Print

Young’s Buses Yeppoon

Before and after shots of Young’s Buses office in Yeppoon. Though only a small project this job posed a few logistical problems  such as working in between 2 existing buildings and limited access from the front and the rear.

We are eternally grateful to the local business adjoining the site for their co-operation and patience during the construction.

The original plan was to try and keep the existing roof and block dividing wall , but it became obvious as construction got under way that this was going to cause more problems than it was worth . So after some discussion the existing dividing wall ,roof  and existing slab were totally demolished basically giving the owner a complete new building rather than a refurbished one.

The end result has given Young’s Buses staff a great new facility to work in and has enhanced the street2013-05-28 15.42.28 2013-05-28 15.42.36 IMAG0902scape
IMAG0907of Hill st .

 

 

 

 

 

Cathedral of Praise Rockhampton

After a 10 week construction period were please to hand back the main auditorium to the Cathedral of Praise with the new suspended ceiling completed and looking fantastic.We’d like to thank the church and their congregation for their Co-operation during the refurbishment

The refurbishedIMAG0660 IMAG0643 IMAG0646 IMAG0645 ceiling was around 800m2 in size and consisted of around 300 compact fluro down lights and LED strip lights.

The new ceiling was also structurally upgraded and fully insulated to meet current standards.

The work was designed and project managed for the client   by Mike Evans from BEAT architects in Rockhampton whom we’d also like to thank for his attention to detail and  support and prompt response times  on all contractor queries .

Pybus Place Emu PK

Due to increased work load the release of final pricing has been put back to the end of November at which time we will also have a full list of inclusions  and body corporate fee’s.

We will  be appointing 3 local real estate agents to handle the sales,Ray white Yeppoon Emu Pk Real Estate and Keppel Real Estate .Prices are expected to range from 325K  to 370K and interested buyers can put their prefered unit on hold until such time as prices are finalized .  The development offers the privacy and security of your own freehold unit in a community environment.

The units are situated almost directly opposite the Emu pk Bowls club and less than a 5 minutes to the beach and  only a 15 minute stroll into Emu Pk town center .For more on Emu Pk go to  www.emupkonline.com.au

106Pattison-St-Image-Rev-Web106Pattison-St-1to3-Image-Rev-Web106Pattison-St-4to7-Image-Rev-Web

New Commercial Building Contract – 800m2 Suspended Ceiling Cathedral of Praise Rockhampton

IMAG0004We have been awarded the commercial building contract for the installation of the new 800m2 suspended ceiling in the Cathedral of Praise Auditorium in Rockhampton.

The work included demolition of the old ceiling, structural up grade to the existing purlins and adjustments to the existing air conditioning.

The ceiling features a suspended floating ribbon and array of LED down lights.

Project duration is approx 8 weeks as is due for completion early November.

Jobs underway

2013-02-09 16.42.35We’re up and running with two new projects a new 4 bed architect designed Queenslander at Keppel Sands and the men are doing it tough struggling to keep focused on their work with the ocean beckoning and  the weather being  fantastic of late.

I need to keep checking that the men remember to take their nailing guns and tallier rather than the tinnies and fishing rods.

IMAG1447We have also commenced work on Young’s Buses Office renovations, which has just about turned in to a total reconstruction.

We elected to remove the existing roof structure rather than back prop it primarily for safety reasons , so we have been left with basically a shell. The restored building will be unrecognizable when completed and will help enhance the streetscape in Hill Street, Yeppoon.

2013-05-28 15.42.36

Keppel Sand tender awarded

We have just received a letter of acceptance for the construction of  a new 400m2  4 bed room residence at Keppel Sands over looking the beach.

The build  is a high quality Queens lander style residence boasting unrestricted beach and island views built to C4 cyclonic building requirements.

Construction is expected to start mid June and is expected to be complete by the end of the year.

We’d like to the thank the owners Mr & Mrs Daniels and Russell Girle of Thomson Adsett Architects in Rockhampton  for awarding us the project